Case
Studies
|
|

001
Preventative Maintenance
Using
a single test site, determine an optimum overall interval
for borehole pump maintenance and examine the separate
contribution to the optimum strategy made by reliability
and efficiency issues.


|
|
002
Preventative Maintenance
Recommend
an optimum maintenance strategy for the bundle
of six tasks that comprise testing of the chlorine gas supply
loop.


|
|
003
Predictive/Condition Monitoring
Determine
the optimum maintenance strategy for a national population of changeover
panel switch gear.


|
|
004
Predictive/condition Monitoring
Devise
an optimum cleaning and inspection interval for dosing analysers and
advise on the potential impact of remote condition monitoring.


|
|
005
Preventative Maintenance
Assess
the current maintenance intervals for OLE high speed neutral track
sections and recommend an optimum interval.


|
|
006
Preventative Maintenance
Recommend
an optimum strategy for maintain the client’s national population of
33kV oil circuit breakers.


|
|
007
Predictive/condition Monitoring
Assess
the costs and risks associated with wooden pole maintenance
and recommend an optimum inspection interval.

|
|
008
Predictive/condition Monitoring
Test
the viability of the proposed maintenance policy for three
types of protection relay systems for 33kV substations,
recommend an optimum maintenance policy and
identify potential cost savings.


|
|
009
Preventative Maintenance
Assess
the existing maintenance policy for 11kV ring main units,
identify any variables that affect the requirements of different
sites and recommend optimum maintenance intervals.


|
|
010
Preventative Maintenance
Devise an
optimum maintenance strategy for cleaning of the
vent valve system, part of the chlorine gas supply loop. Identify
any reduction in Total Business Impact compared to
the existing strategy.

|
|
011
Predictive/Condition Monitoring
Provide
a robust risk-justified basis for inspection intervals of
chlorination failsafe system.

|
|
012
Predictive/Condition Monitoring
Estimate the
pattern of unit failure and the cumulative probability
of failure of chlorine gas leak detectors and devise
an appropriate cost/risk optimised inspection strategy.

|
|
013 Sanity Check
Advise
on client’s proposals to spend £500,000 to upgrade existing
maintenance information system, which was expensive
to operate, to a Y2K compliant platform for 55 sites.


|